荔榕高速公路全長(zhǎng)67.288公里,中交二公局負(fù)責(zé)全線范圍內(nèi)的房建工程,包括管理中心1處、服務(wù)區(qū)2處、收費(fèi)站3處及全線隧道變電所房建工程,總建筑面積30035.87平方米。
The Libo-Rongjiang Expressway is 67.288km long, and CCCC Second Highway Engineering Co is responsible for the entire line of housing construction projects, including 1 management center, 2 service areas, 3 toll stations and the entire line of tunnel substation construction, with a total construction area of 30035.87m2.